Dual-feed switchgear
Main-tie-main metal-clad switchgear lineups with automatic throwover and sync-check relaying, so the bus stays fed when a utility source drops.
Power distribution, backup generation and commissioning support. Torus installs and tests the electrical systems that keep a data center running: medium-voltage distribution, generator paralleling, UPS, automatic and static transfer switches, PDUs and RPPs, and power monitoring.
Every link between the utility and the white space is a place where a single failure can drop load. These are the systems Torus installs and tests along the way.
Redundant sources with automatic transfer
Main-tie-main, sync-check relaying
Pad-mount and dry-type, down to 480 V
Closed-transition paralleling, NFPA 110 Level 1
Double conversion, lithium-ion or VRLA
Source selection and distribution to the rows
Redundant utility feeds and automatic transfer, so a single upstream failure doesn’t reach the white space.
Main-tie-main metal-clad switchgear lineups with automatic throwover and sync-check relaying, so the bus stays fed when a utility source drops.
Pad-mount and indoor dry-type transformers down to 480 V, installed and tested before energization.
When the utility drops, generators have to start, synchronize and pick up the load within the time the design requires. We build and test the switchgear that does it.
Load sharing, protective relays and synchronizers for transfers to and from utility power without dropping load.
Day tanks, transfer pumps, leak detection and emergency shutoffs, installed to NFPA 110 Level 1 requirements.
Step-load tests at 25, 50, 75 and 100 percent to verify voltage, frequency, transient response and cooling.
Modular double-conversion UPS lineups with lithium-ion or VRLA batteries, installed to the manufacturer’s requirements.
ATS for transfer between utility and generator sources, and STS for fast source selection between redundant buses on single-corded loads.
Power distribution units and remote power panels that carry critical power from the UPS to the rows and racks.
Continuous busway runs with plug-in tap boxes for high-density racks.
Data center commissioning runs in five levels. Torus crews support the electrical scope, from installation checks through integrated systems testing (IST).
Generators, UPS and switchgear are tested at the factory before shipment.
Equipment is received, inspected for shipping damage and checked against the submittals.
Point-to-point wiring checks, torque, insulation resistance and breaker testing before energization.
Each system runs on its own: generator load steps, UPS battery discharge, transfer sequences.
The whole facility is tested together, including simulated utility failure, failover and heat-load testing.
Meters, time-synchronized event recording and Modbus monitoring of circuits and busway, so breaker operations and disturbances can be reconstructed and explained.
Tell us the scope and schedule. We’ll tell you where Torus fits and what we’d need from you.