Solar PV electrical balance of plant
- Trenching, conduit and duct bank
- Cable tray, harnesses and combiner boxes
- Inverter and transformer pads
- Tracker motor and controller wiring
Torus Power Integration is an EPC for utility-scale and commercial solar and battery storage projects. We engineer, procure and build the plant, from DC collection and inverter and transformer pads to medium-voltage collection and standby generation.
Torus Power Integration takes solar and battery storage projects through engineering, procurement and construction, with testing and documentation at each stage.
Plant design coordinated with the owner, the equipment manufacturers and the utility’s interconnection requirements.
Sourcing and management of major equipment, including inverters, batteries, transformers and switchgear, through delivery to site.
Construction through energization, built to the engineered design and tested before anything is energized.
From the first trench to the utility connection, with the testing and documentation each stage needs.
Every system is built to NFPA 855 and NEC Article 706, matched to the equipment’s UL 9540 listing and UL 9540A test data, and coordinated with the local fire authority.
Capacity and round-trip efficiency (RTE) testing, fire-system interlock checks and EMS integration, verified before the system goes into service.
Hardwired and fiber links between the BMS, PCS, EMS and site controller, terminated, tested and documented for commissioning.
| System | Codes and standards | Torus scope |
|---|---|---|
| Solar PV | NEC 690, 691, 705; IEEE 1547; IEEE 2800 | DC collection, combiners, harnesses, tracker wiring, inverter skids |
| Battery storage | NFPA 855; UL 9540 and 9540A; NEC 706; NFPA 68 and 69 | PCS landings, auxiliary power, fire-system interlocks, communications |
| Medium voltage | IEEE C37; NESC; ANSI/NETA ATS | Collection, grounding, switchgear, pad-mount transformers, metering |
| Standby generation | NEC 700, 701, 702; NFPA 110 | Generator sets, transfer switches, paralleling gear, load bank tests |
| Worker safety | NFPA 70E; OSHA 1926 Subpart V; OSHA 1910.269 | Daily job hazard analysis, energized-work controls, PPE |
Torus Power Integration is working as EPC subcontractor on battery storage projects in development in Colombia. Design follows Colombia’s RETIE regulation and NTC 2050.
Battery storage projects in development in Colombia.
Colombia’s technical regulation for electrical installations and its electrical code.
Single-line diagrams, specifications and the schedule help us price accurately. We’ll reply with questions or a proposal.